Projects

Aerial view of large solar farm in countryside

Project Overview: Astatine has partnered with a Ballina beverage company to accelerate the decarbonisation of their manufacturing facility in County Mayo. 20MW Solar PV System 8 MW / 16MWh Battery Energy Storage System (BESS) 3 MW+ Heat Pump Key Results: 32,000 Solar Panels&hellip; <a href="https://astatine.ie/case-studies/coca-cola/" class="read-more">Read More</a>

Learn More
Industrial pipe system with metal ducts and valves.

Challenge: Irish Distillers Pernod Ricard, a leader in the Irish whiskey industry, sought to optimise its energy use and reduce its carbon footprint while maintaining high production standards. The company aimed to achieve significant energy and cost savings, aligned with its sustainability targets. Solution: Astatine provided tailored heat solutions&hellip; <a href="https://astatine.ie/case-studies/irish-distillers/" class="read-more">Read More</a>

Learn More
Large solar farm in green rural landscape

Project Overview: ENGIE, an international energy provider, have appointed Astatine as EPC Contractor to Design and Build 3 Grid Connected Solar Farms across Ireland. ~ 15.7 GWh Annual Energy Production 18,000 kW Ground Mount Solar PV System ~5,000 tonnes of CO2 Reduced Annually&hellip; <a href="https://astatine.ie/case-studies/engie/" class="read-more">Read More</a>

Learn More
Aerial view of industrial equipment installation.

Project Overview: Creating Ireland’s First Zero – Emission Distillery. The combination of solar energy, hydro and very high temperature heat pumps, will make Ahascragh the first zero emission distillery in Ireland. Renewable heat and power specialists Astatine have developed and installed a revolutionary new system which will become the first&hellip; <a href="https://astatine.ie/case-studies/ahascragh-distillery/" class="read-more">Read More</a>

Learn More
Large solar farm in rural landscape view.

Project Overview: Leading dairy co-operative Arrabawn has partnered with Irish industrial decarbonisation specialists Astatine to install a new solar power system, delivering Green Power to its Tipperary site with no upfront capital cost (zero CAPEX). 5.6 MW Ground Mount Solar PV System 15% Annual&hellip; <a href="https://astatine.ie/case-studies/arrabawn/" class="read-more">Read More</a>

Learn More
Aerial view of solar panels in lush countryside.

Project Overview: In 2018, Dale Farm Solar, one of Ireland’s leading dairy producers, partnered with Astatine to implement Ireland’s largest industrial solar installation. This 5,000 kW solar system, a full turnkey solution, now powers 24% of their operations, significantly reducing their reliance on conventional energy sources. ~ 4.5 GWh&hellip; <a href="https://astatine.ie/case-studies/dale-farm/" class="read-more">Read More</a>

Learn More
Green trucks lined up at a warehouse

Project Overview: Electrify your HGV fleet with a turnkey solution, including electrical infrastructure, EV chargers (500kW–1,200kW), and electric HGVs. 1200 kW EV Charger 1000 GW km Net Increase 63% Decrease in Greenhouse Gas Emissions Key Results: Year of completion: 2024&hellip; <a href="https://astatine.ie/case-studies/cmls/" class="read-more">Read More</a>

Learn More
decoration