Project Overview:

Astatine has partnered with Coca-Cola, a global beverage company, to accelerate the decarbonisation of their manufacturing facility in County Mayo. Our innovative contributions include designing and developing a Solar System, High Temperature Heat Pump, and Battery Storage solution.

Key Results:

  • ~23 MW Solar PV System installed.
  • 8 battery storage containers.
  • 16 MW BESS
  • ~18,300 MWh annual energy production.
  • Annual CO2 reduction of ~4,600,000 kg.
  • A reduction in energy consumption equivalent to the annual electricity usage of 1,150 homes.

Project Highlights:

Astatine’s LCOE Modelling enables an 80% reduction in Coca-Cola’s energy costs, achieving unmatched energy savings and a remarkable 80% reduction in carbon emissions.