Case Study

Ahascragh Distillery

Project Overview:
Creating Ireland’s First Zero – Emission Distillery. The combination of solar energy, hydro and very high temperature heat pumps, will make Ahascragh the first zero emission distillery in Ireland. Renewable heat and power specialists Astatine have developed and installed a revolutionary new system which will become the first in Ireland to use a heat pump above 100°C in Ireland, using water up to 120°C.

120°C Milestone First Process Heat Pump in Ireland & UK
0 Fossil Fuels 100% Clean, Renewable Heat with no Onsite Combustion
4x Efficiency Up to 4x the Output from Every Input

Key Results:

Ahascragh received €500,000 in capital support as part of SEAI’s EXEED Programme, aimed at organisations who are planning an energy efficient investment project. Funding is also available from IDA and Enterprise Ireland. Utilising the various grants available results in typical paybacks of under 3 years.

High temperature heat pumps are the cornerstone of the Ireland’s strategy of decarbonising industrial heat. Astatine, with our experiences management team and leading global supply chain, are perfectly placed to help you decarbonise your business.

Ballina bev and data
Ballina Beverage Company

Project Overview: Astatine has partnered with a Ballina beverage company to accelerate the decarbonisation of their manufacturing facility in County Mayo. 20MW Solar PV System 8 MW / 16MWh Battery Energy Storage System (BESS) 3 MW+ Heat Pump Key Results: 32,000 Solar Panels… Read More

Learn More
Untitled design (1) (1)
Pernod Ricard | Irish Distillers

Challenge: Irish Distillers Pernod Ricard, a leader in the Irish whiskey industry, sought to optimise its energy use and reduce its carbon footprint while maintaining high production standards. The company aimed to achieve significant energy and cost savings, aligned with its sustainability targets. Solution: Astatine provided tailored heat solutions… Read More

Learn More
New Engie-case-study-projects-section-scaled-e1761041008286
ENGIE

Project Overview: ENGIE, an international energy provider, have appointed Astatine as EPC Contractor to Design and Build 3 Grid Connected Solar Farms across Ireland. ~ 15.7 GWh Annual Energy Production 18,000 kW Ground Mount Solar PV System ~5,000 tonnes of CO2 Reduced Annually… Read More

Learn More